Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note: Armstrong Worldwide provide:-

Solar panelsSolar panels
Heating systemsHeating systems
Central heatingCentral heating
Water pumpsWater pumps
 

Request Information

Home
Include Article
Advertise
 

 

 
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

ARMSTRONG WORLDWIDE Renewable Solutions For Sunderland Schools Are Top Of Their Class

Systems integrating biomass and solar with high efficiency HVAC components are delivering low carbon performance for two new schools in Sunderland built under the government’s BSF (Building Schools for the Future) programme.

Sunderland City Council’s BSF project is expected to revolutionise education in the area by introducing cutting edge technology to classrooms and creating 21st century buildings. In total the scheme involves the creation of three new academies and three new schools, to be designed and built by Balfour Beatty Construction (Northern) Limited.

Low carbon footprint is a key priority in the design of the new buildings. Balfour Beatty Engineering Services in collaboration with Leicestershire-based Rural Energy, incorporated biomass boilers and solar panels into the heating and hot water systems for the first two academies to be built under the project – Academy 360 (which replaces Pennywell School and Quarry View Primary School) and Red House Academy (which replaces Hylton Red House School). It was decided that off-site construction would be the best way to deliver the projects and Armstrong (a specialist in fully-integrated plant rooms) was approached to supply the energy centres for both academies.

At the heart of each energy centre is a 350 to 500kW biomass boiler, fuelled by wood pellets. Heat is also generated by solar panels. Armstrong variable speed booster sets and IVS pumps distribute hot and cold water supplies throughout each site. By utilising a number of high efficiency variable speed components, and by employing advanced controls technology, the system design ensures that energy efficiency performance will outperform standard school HVAC installations by a significant margin throughout the equipment’s lifetime.

Each of the energy centres was constructed at Armstrong’s purpose-designed factory in Halesowen, West Midlands , and housed in its own 18m x 8m plant room enclosure. On the date required within the overall project schedule, each energy centre was delivered to site fully-assembled and requiring only final connections. Off-site manufacture of each energy centre made it possible for construction to proceed concurrently with the rest of the project, and meant that assembly could continue regardless of the weather. Carrying out this part of the project away from the construction site, in a purpose-designed factory, also reduced the health and safety risk.

From a design viewpoint, bringing together the different renewable and low carbon components within an integrated system gave greater potential to exploit the very different energy saving characteristics of each of the technologies.

Steve Cooper, Director of Renewables and Sustainability for Armstrong worldwide, said, “With the advent of renewable technologies alongside more traditional low carbon technologies, off-site construction is really the only way to go. The demanding requirements of a project such as Building Schools for the Future necessitates full integration of all system components to provide system-wide efficiency. Off-site construction is key to achieve these levels of performance.”

Email: salesuk@armlink.com


3M Branding advertising Holographic Projection display Advertising screens News 301109

Armstrong Solar panels Heating systems Central heating Water pumps News 301109

HCP Partition walls Architectural metalwork Steel doors Industrial News 301109

Knauf Drywall Thermal insulation Wall insulation Roof insulation Plaster News 301109

Tarkett Safety floor Commercial laminate flooring Non slip News 301109

TilePlans Commercial Flooring Commercial Floor Coverings Retail Floor News 301109

SSQ Roofing tiles Natural stone floor Natural stone tiles News 011209

Lumitron Ceiling lighting Lighting fixtures Commercial lighting Security News 021209

Dimplex Heating systems Hot water heating Radiant floor heat News 021209

Marshall-Tufflex Cable Management Floor Boxes Underfloor Services Cable Trays News 021209

Leaderflush Shapland Timber doors Interior folding doors Internal sliding doors News 021209

Pilkington Glass manufacturer Tempered glass Window manufacturer Glass toughening News 021209

Dorma Doors external External wooden doors Hardwood internal doors News 021209

Becker Sliding Partitions Sliding walls Moveable partition Partition walls Office News 021209

Britannia Kitchen Ventilation fans Kitchen extractor fan Commercial kitchen ventilation News 021209

4G Design Architects design House architects Building design Commercial News 031209

Klober Roof tile Metal roofing materials Clay tile roofing News 031209

SAS International Ceiling panels Architectural metalwork Commercial ceilings Acoustic News 031209

Dulux Natural paints Trade paint Paint systems Interior painters News 031209

Terrys Fabrics Curtain fabric Custom made curtains Curtains for windows News 031209

Purus Shower drains Floor drains Wet rooms Shower tray News 031209

Cembrit Roof slates Reclaimed roof slate Natural stone tiles News 071209

GE Lighting Accent lighting LED lights Exterior light Wall lighting News 071209

Marley Eternit Building cladding Roof cladding Eternit Cladding materials News 071209

Redland Roofing tiles Redland roof tiles Clay tile roofing News 071209

Tyco Thermal Heat tracing Temperature controls Heating cable Trace heating News 071209

Klober Roof ridge vent Roofing vents Slate roof tile News 081209

Laidlaw Stair rail Stair railings Wheelchair ramps Steel doorsets News 081209

Kingspan insulation Builders merchants Builders materials Loft insulation News 081209

Osram LED outdoor lighting Energy saving light Exterior light News 091209

Andrews Water heater Electric water heaters Gas News 101209

Flowcrete Concrete screed Resin flooring levelling Epoxy resins News 101209

Osram LED lighting LED lights Slim light Architectural lighting News 111209

S P Coils Heat pump Heating system Heating pump Underfloor heat News 101209

 

 

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Solar panels
Heating systems Central heating
Water pumps