Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note: Armstrong Ceilings provide:-

Suspended ceiling systemsSuspended ceiling systems
Acoustic ceiling panelsAcoustic ceiling panels
Accoustic ceilingsAccoustic ceilings

Request Information

Home
Include Article
Advertise
 

 

 
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

ARMSTRONG’S - “Off Cut Recycling Scheme” At University Hospital, Birmingham

As part of our joint procurement initiative with Balfour Beatty, Armstrong Ceilings was asked to provide the ceiling systems for the University Hospital, Birmingham project a £582 million project providing both acute and Adult Psychiatric facilities for the University Hospital Birmingham NHS Foundation Trust.

Armstrong also worked very closely with the Sheffield based architects, BDP, and Titan Ceilings, so this project represented a real collaboration between all parties. The University Hospital, Birmingham construction joint venture comprising Balfour Beatty Construction and Balfour Beatty Engineering Services was underpinned by a Sustainable Construction Plan, emphasising a ‘joined up’ attitude to sustainability and the environment. Armstrong Bioguard Plain and Bioguard Acoustic tiles were specified to provide a combination of acoustic, anti microbial, ISO 5 clean room performance solutions for the hospital environment.

One of the deciding factors in us being asked to collaborate on this project, was our willingness to trial an off-cut recycling scheme; whereby we would collect the offcuts from the ceilings as they were installed and recycle the waste materials to make new tiles. One of the aims was to then use these new tiles on site – effectively making ‘green rooms’ within the building. We were asked to set up a system that would enable all the waste to be captured and collected as it was generated. This was on a purely trial basis – a real learning exercise for all involved.

We did, of course, face a number of challenges. There was cross contamination of waste; which meant that not all the waste could be recycled, even after a lengthy sorting process. In addition, a solution for on-site storage of Armstrong materials needed to be resolved, as space was limited. However, Balfour Beatty and Titan Ceilings gave the scheme their full support, ensuring any problems were kept to a minimum.

Jim Duffy (Head of Environment and Quality), Balfour Beatty Construction Northern, anticipates that major building contractors and customers could soon make on-site recycling mandatory. He said, “This major project identified ceiling tile cut offs as an item that would be unacceptable to send to landfill. The project pushed the boundaries with Armstrong and Titan and all three parties agreed to trial the recycling scheme. Having overcome some initial challenges in the first year, the trials success and failures have been reviewed and actions put in place to improve the volume of recycled material in the second year of the trial. Having the commitment to trial the scheme on a non contractual basis was a great step forward. Committing to improve the recycling process is a great testimony to all three parties. The challenge for the future is making this the norm within the three businesses.”

The University Hospital, Birmingham construction joint venture was given an award by the Chartered Institute of Waste Management for outstanding site management of waste – a direct result and recognition of the hard work put in by all involved. It is certain that the practices that have been put in place will play a significant role in the future of waste management.

Lets not forget the additional environmental benefit of specifying Armstrong Bioguard ceilings. At the end of their life the tiles at Birmingham hospital can be fully recycled back into the Armstrong “End of Life” recycling scheme!

Consort Healthcare, Balfour Beatty’s PPP healthcare vehicle, reached financial close for the PPP contract to design, construct, finance, maintain and manage
the lifecycle replacement of the new facilities in June 2006.

The construction work is being carried out by a joint venture of Balfour Beatty Construction Northern and Balfour Beatty Engineering Services. Facilities management is being provided by Balfour Beatty Workplace.
Action: to be completed*

Email: Katie@thecharlottestreetagency.com


3M Branding advertising Electronic whiteboards Commercial applications News 141209

Grohe LED light strips LED rope light Integrated lights News 141209

Saint-Gobain Sustainable energy Sustainable building Carbon home Solar energy News 141209

Terrys Fabrics Custom Curtain fabric suppliers Window treatments curtains News 141209

Osram Energy saving lighting Energy efficient Light energy saving News 141209

Zip Heaters Water heaters Hot water system Hot water boiler News 151209

Harlequin Sprung dance floor Dance floor Dance studio flooring News 151209

DHF Door furniture Door hardware Front doors Doors manufacturer News 151209

Advanced Hygienic Contracting Hygienic wall cladding Bathroom wall cladding Ceiling cladding News 151209

Polypipe Rainwater drainage Plastic drainage pipeWater heater systems News 151209

Cembrit Roof slates Slate tiles Roof slate Natural slate News 151209

Knauf Drywall Thermal insulation board Floor insulation Gypsum News 151209

Dimplex Heat pumps The building regulations Air heat pumps News 161209

Armstrongs Suspended ceiling systems Acoustic ceiling panels Accoustic ceilings News 161209

Steadmans Roofing products Roofing service Roofing cladding Insulated panel News 171209

Weatherite Heat pumps Air handling unit Heating air conditioning News 171209

AVK/SEG Power generator Power generator manufacturer Industrial power generator News 171209

Flowcrete Floor screed Resin flooring Concrete screed News 171209

Dorma Doors internal Doors external Doors french Residential doors News 171209

Reigens Artificial light Lighting exterior Commercial lights Fixture lighting News 171209

Mitsubishi Heat pumps Air conditioning units Heating air conditioning News 171209

Hunter Plastics Plastic guttering Guttering systems Plastic gutter Rainwater gutter News 211209

Crown Wall paint Exterior paint Paint supplies House paint News 211209

Tileplans Industrial flooring Garage floor covering Garage floor cover News 211209

Coolmation Industrial cooling systems Industrial water chiller Pump chiller News 211209

Ardex Epoxy floor Floor screeds Tile adhesives Polyurethane resin News 211209

Leaderflush Shapland Doors internal Wooden interior doors Contemporary interior doors News 211209

Dow Floor insulation Insulation materials Thermal insulation Soundproofing insulation News 211209

Velux Roof windows Skylight windows Window blinds Velux windows News 211209

Dorma Doors internal Doors external Residential doors Affordable doors News 221209

Schueco Structural glazing Curtain walling Structural glass Glass curtain News 221209

SAS International Acoustic-ceiling-Acoustic panels Suspended ceiling Ceiling solutions News 221209

Aico Fire detection Fire protection Fire alarm Fire systems News 221209

Armstrong Acoustic ceiling Suspended ceilings Acoustic panels Ceiling panels News 221209

Redland Roof tiles Tile roofing Slate roofing Roofing systems News 221209

Mitsubishi Heat pumps Central air conditioning Air conditioning units News 221209

KNX Lighting controls Lighting software Intelligent building Automation controls News 221209

Osram LED lights LED lighting Slim lighting Architectural lights News 221209

Dulux Trade paint Paint decorating Colour paints Buy paint News 221209

 

 

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Suspended ceiling systems
Acoustic ceiling panels Accoustic ceilings